Terry & Carol Moore Park Pathway Upgrade, Nerang

Overview

OSM Concrete was engaged to deliver pedestrian pathway construction works at Terry & Carol Moore Park in Nerang as part of a staged public parkland upgrade for Gold Coast City Council.

The project involved the construction of a new concrete footpath network through an environmentally sensitive park setting, requiring careful planning around existing vegetation, site access, levels, drainage and long-term durability requirements.

A major component of the works involved deep root concrete pathway design to help preserve mature tree systems throughout the park while still delivering safe and accessible public infrastructure.

Working through established parkland conditions required disciplined site management, careful staging and attention to environmental considerations throughout construction.

Scope of Works

  • Pedestrian pathway construction
  • Concrete footpath installation
  • Park pathway upgrades
  • Minor civil concrete works
  • Deep root pathway construction
  • Pathway setout and curved alignment works
  • Surface preparation and subgrade works
  • Integration with future bridge and boardwalk connections
  • Public park infrastructure improvements

Services Provided

  • Civil concrete construction
  • Public infrastructure concrete works
  • Council pathway construction
  • Curved pathway construction
  • Reinforced concrete footpaths
  • Environmentally sensitive concrete construction
  • Parkland access infrastructure

Project Challenges

One of the major challenges on the project was delivering new pathway infrastructure while preserving existing mature vegetation throughout the park.

The pathway alignment passed through established tree zones, requiring specialised deep root concrete design principles to minimise impact to existing root systems while maintaining long-term structural performance of the pathway.

Additional complexities included varying levels and grades through the site, maintaining access through active public park areas, curved pathway geometry, staging works efficiently across multiple sections, and coordinating future interfaces with bridge and boardwalk infrastructure.

The project required careful planning and execution to balance durability, accessibility and environmental sensitivity.

Construction & Delivery

The supplied design drawings show an extensive staged pathway network through Terry & Carol Moore Park, including multiple curved alignment sections and long continuous pathway runs extending through the reserve.

The pathway design incorporated deep root concrete footpath details specifically intended to help protect mature vegetation while improving pedestrian accessibility throughout the parkland environment.

OSM Concrete coordinated pathway construction works carefully around existing site conditions while maintaining a clean and consistent finish across the project.

Outcome

The completed pathway upgrade improves pedestrian accessibility, connectivity and usability throughout Terry & Carol Moore Park while maintaining the natural character of the surrounding environment.

By combining quality concrete construction with environmentally conscious design considerations, the project delivers durable long-term public infrastructure suited to a busy community park setting.

This project reflects OSM Concrete’s capability in council, civil and public infrastructure works where presentation, durability and environmental sensitivity all need to work together.

For high-quality civil project management and construction, contact us here.